From: route@monster.com
Sent: Tuesday, April 12, 2016 11:32 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
Senior CAD Designer with 20 years
experience in all phases of drafting and design including mechanical, civil,
GIS and electrical drawings, base map creation, walk-out updates, creation of
CAD development software and drafting standards. I also have progressive
management and administration experience including supervision of up to 15
drafting professionals. |
|
EXPERIENCE: |
3/2009 - Present |
Rainier Painting Company |
Bellevue, WA |
|
Industry: |
|||
|
|
|||
|
Schedule appointments with
customers to determine scope of project. Create cost estimate/schedule for
project. Implement project procedural order to complete coating application. Write
change orders and insure customer satisfaction by walking completed job with
customer. |
|||
|
1/2008 - 2/2009 |
Puget Sound Energy |
Bellevue, WA |
|
|
Industry: |
|||
|
|
|||
|
Create underground electrical
drawings to test functionality of new AutoCAD Utility Design software.
Created AUD technical documentation and training manual. Worked on AutoCAD
Untility Design committee to develope standard procedures. Provide AutoCAD
support such as plot file errors, critical errors and command
issues. Requested quotes for hardware, coordinate delivery and setup date.
Travel to location to setup plotters. Set-up and test plot drivers within
Image Site. Replace plotter ink and printer heads when needed. Supply meter
reads to Xerox for large format printers. Responsible for inventory of
existing licenses. Keep inventory of users to forecast required future
AutoCAD licenses. Setup AutoCAD and configured machines for new users.
Work with programmer and Potelco personnel to debug AUD and learn the
electrical design. Create LISP and VBA applications. Studied all AutoCAD
2008’s and 2009’s new functionality. |
|||
|
6/2007 - 2/2008 |
Weyerheauser |
Federal Way, WA |
|
|
Industry: |
|||
|
|
|||
|
Worked with CADWorx, a 3rd party
AutoCAD 3d software for piping design. Was part of team to transfer in-house
3d CAD to AutoCAD 2006 platform. |
|||
|
6/2006 - 5/2007 |
The Robbins Company |
Kent, WA |
|
|
Industry: |
|||
|
|
|||
|
Drafted 2d and 3d mechanical parts
using AutoCAD and Solid Edge. Edited and made changes to existing drawings. |
|||
|
3/2003 - 4/2007 |
Verizon Wireless |
Bellevue, WA |
|
|
|
|||
|
Used AutoCAD to update and
maintain the Verizon Washington/Oregon/Montana state cell site change out
from Motorola to Lucent Technologies. Collected information and created maps
with location of proposed and existing cell sites. Supplied field personnel with
current cell site information. |
|||
|
11/1998 - 2/2003 |
AT&T Broadband |
Kent, WA |
|
|
Industry: |
|||
|
|
|||
|
Formulated scope and objectives
for new applications. Lead committee to implement new AutoCAD & GIS
solutions & standards. Create automated systems to reduce and shorten
designers/drafters design time. Provided technical and drawing support for
AutoCAD Designers/Drafters. Meet with group to discuss CAD standards and
test new software releases. Assist other programmers with difficult problems
or coding. Created documentation to be used with CAD Tools, and ATT_Mapp
routines. Setup CAD standards, designed directory structure and drawing
methods for drafting CAD drawings. Interviewed and hired new employees. Held
weekly CAD progress meetings. Supported office of 100 users with solutions to
solving hardware and software problems. Created intranet information access
using HTML, Coldfusion and SQL & ArcView Created AutoCAD ATT_Map
programming library using AutoCAD MAP API, AutoLISP & Visual Basic. |
|||
|
1/1995 - 11/1998 |
Electric Lightwave |
Seattle, WA |
|
|
|
|||
|
Collected existing telephone field
data for the design of new fiber optic cable routs and the construction of
feasibility reports. Management duties included projecting deadlines,
hiring of employees, assignment of work and employee problem solving. Setup
CAD drawing structure and created instructions/documentation for drafting in
a systematic approach. Responsible for obtaining NAD83 from city & county
governments for drafting existing outside plant. Created land base using PTI,
GIS and AutoCAD software. Converted U.S. West exchange information to PTI
standards. Used AutoLISP to write routines to speed up the
process of drawing all outside plant and creating title
blocks from land base. |
|||
|
3/1994 - 1/1995 |
Parametrix/Herrera Environmental |
Kirkland/WA |
|
|
|
|||
|
Responsible for civil engineering
CAD drawings for Environmental clean-up project. |
|||
|
11/1991 - 1/1993 |
TelComm Associates, Inc. |
Grand Rapids/MI |
|
|
|
|||
|
Developed third party GIS
drafting/design software using AutoLISP and AutoCAD. Responsible for
developing key-mapping software (screen pick) for loading key-map drawings.
Created and implemented a pull down and tablet menuing system written in
AutoLISP and C. Designed technical documentation and illustrations for users
manual. |
|||
|
11/1990 - 11/1991 |
Gelman Sciences Inc. |
||
|
Industry: |
|||
|
|
|||
|
Created mechanical and electrical
drawings for a filter manufacturing system which consisted of BOM's, details,
assembly and installation designs. Re-engineered an existing filter
manufacturing system and drying/ventilation system. |
|||
|
EDUCATION: |
9/2011 - 10/2011 |
Washington Aerospace Training
& Research Center |
|
|
|
|||
|
This course focused on building
structures for the airline industry. Using tools in the actual process we
drilled, reamed, honed, bored and countersunk holes in aluminum. Pieces were
riveted to create actual structures on aircraft. All materials assembled were
to be within Boeing specified tolerance. |
|||
|
9/1985 |
Easter Michigan University |
US |
|
|
|
|||
|
Bachelor's Degree in Computer
Aided Design & Programming. |
|||
|
LANGUAGES: |
Languages |
Proficiency Level |
English |
Fluent |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||